Project Portfolio & Engineering Excellence
Real projects, proven results: Showcasing 500+ MW of high-performance solar engineering across diverse markets and applications.

Desert Vista Solar Farm
This project exemplifies our approach to maximizing energy production in challenging desert environments, requiring specialized solutions for extreme temperatures, water scarcity, and soiling.
Performance Outcomes:
- Energy Production: 168.2 GWh (103% of projection)
- Performance Ratio: 87.3% average (vs. 75-80% benchmark)
- Availability: 99.4% system availability
- Economic Impact: 12% LCOE improvement

Agrivoltaic Innovation Project
A groundbreaking installation demonstrating the successful integration of solar energy with agricultural operations, balancing energy generation with crop productivity.
Dual-Purpose Results:
- Energy Performance: 42.8 GWh annual production (85.7% PR)
- Agricultural Success: Maintained 96% baseline crop productivity
- Economic Synergy: Revenues 47% higher than traditional farming
- Environmental Benefits: 35% reduction in water usage

Advanced Manufacturing Facility
A complex rooftop installation demonstrating our expertise in challenging commercial environments with multiple roof types, structural constraints, and strict aesthetic requirements.
Performance Achievements:
- Energy Optimization: 6.8 GWh annual production (86.2% PR)
- Economic Impact: 8.2-year payback with 18.7% IRR
- Operational Excellence: 12% reduction in facility maintenance costs

Portfolio Due Diligence
Our comprehensive due diligence services supported a major infrastructure fund’s acquisition of a 250 MW solar project portfolio, demonstrating our expertise in rapid technical assessment, risk identification, and performance validation.
Value Delivered:
- Risk Mitigation: Identified and quantified $8.3M in technical risks
- Performance Optimization: Recommendations projected to increase portfolio NPV by $23.7M
- Investment Confidence: Supported successful $180M portfolio acquisition
Lessons Learned & Best Practices
Design Optimization
Bifacial systems consistently outperform projections when properly engineered. Advanced monitoring pays for itself within 18 months. Grid service revenues can improve project economics by 8-15%.
Operational Excellence
Proactive maintenance strategies reduce lifetime O&M costs by 25-30%. Weather-adaptive algorithms improve energy capture by 3-5% annually.
Stakeholder Engagement
Clear communication and active stakeholder engagement are not just ‘nice-to-haves’; they are critical factors that significantly impact project success and community acceptance.